Construction Cost

Depending on the Cost model selected on the Building Cost Summary dialog, the construction cost report will be generated and displayed using one of 3 formats:

 

 

The outputs of the Cost calculation can be included automatically within the Construction cost data to be fed to EnergyPlus for LCC economic analysis and in optimisation simulations.

Note: Construction cost calculations for models where the zone multiplier is used are not always 100% accurate because the construction cost of internal surfaces between multiplied zones and adiabatic component blocks can be over-estimated.

Note: In order for the cost of renewable systems such as solar PV and hot water panels and wind turbines to be included in the Construction cost report (and any cost-related KPIs used in an optimisation) those generators must be specified in an Electric Load Centre.